MELDUNG

RLT-Geraet 100.00 Luftmwenge

Battery Cell Gigafactory

The client had one of the large AHU units with an air volume of 100,000 m³/h tested live in a test setup from the factory in Bavaria, accompanied by TÜV Süd.
The results: Requirement exceeded!

GerätGeblockt

LESS IS MORE- BLOCKED AHUs

With the new solution, the floor and ceiling, for example, are divided in parts, because the modules that are on top of each other are combined. Many previous steps during assembly are no longer necessary. This saves time on the construction site.